Published on 05.02.21

Upcycling XXL: Turning a tower segment into a swimming pool

We have turned a segment of a disused wind turbine into an indoor swimming pool. Various North German media reported on how our Managing Director Dirk Ketelsen's vision became reality.

For us, sustainability isn't just a marketing slogan – we're actively considering how we can act more sustainably in our everyday lives. This naturally includes the proper separation and disposal of waste – or even avoiding it altogether. We've transformed the lower tower segment of a dismantled wind turbine into a 25-meter-long swimming lane at Dirkshof.

This is a joy not only for our Dirkshof triathletes Eike and Ann-Christin, who can now train here, but also for the rest of the team. NDR television filmed a fitting report featuring the swimming pool and training sessions as well as interviewing Dirk Ketelsen about the upcycling process. The sh:z and Husumer Nachrichten also published articles about the project.

Download the article in the Husumer Nachrichten (PDF, 475 KB)

More news

Am Boden liegende Rotorblätter eines in Konstruktion befindlichen Windrads unter bewölktem Himmel.

15.03.2022

H2 Pioneering work in Reussenköge and Bredstedt

Read more
Ein Kameramann mit blauer Kapuze filmt ein Interview zwischen einem Mann und einer Frau in einem Feld.

15.11.2022

ZDF frontal: Disposable electricity

Read more